Ask an arborist

tree-care.info for tree advice

You are viewing an archive of old posts to the Ask an Arborist forum. New messages can not be posted here. Please visit the live forum if you wish to post a question.

internal tree pits


Posted by Daniel Wilkinson , Mar 16,2007,17:09       Forum

Hello. I am working on a college scheme in Bradford where we have 2.2m x 2.2m x 1m depth tree pits set within an internal atrium area. The tree pits are formed with a concrete wall and base with drainage through to the building sub-base. I am wanting to plant 4m high Cordyline australis trees within the tree pits.

I am unsure of what should constitute the exact make up of the tree pit itself ie. Should I just fill it with 1m depth of topsoil? Or should there be a gravel layer at the base of the pit to aid drainage? If so what depth should this be? I am worried that if I just fill the tree pit with 1 metre depth of topsoil that the soil may turn anaerobic due to compaction? If I have a gravel layer at the base would this leave room for the root system of a cordyline to develop properly?

Any help on this matter would be gratefully received.


Current page

Followups

Advice offered in this forum is of a general nature only. It is by its nature not based on any site investigation and should not be relied upon. Neither the forum administrator nor any contributor will be held liable for damages occurring as a result of relying on advice given here. You should contact a competent arboriculturist for a more detailed answer.